Skip to content
NerdyTV
Browse
On NowSpaceScienceMoviesClassic TVCollectionsMy Nerdy List

Artemis and the Moon

Core Stage for Artemis II Rocket Moved to Pegasus Barge for Departure to Kennedy Space Center

6 min · 2024

These images and videos show team members moving the first core stage that will help launch the first crewed flight of NASA’s SLS (Space Launch System) rocket for the agency’s Artemis II mission. The move marked the first time a fully assembled Moon rocket stage for a crewed mission has rolled out from NASA’s Michoud Assembly Facility in New Orleans since the Apollo Program, The core stage was…

+ My Nerdy List
Credit
NASA/MSFC
Licence
Public domain (NASA media usage guidelines)

Nerd Out On

  • Axiom Space Sortie Spacesuit Turntable2026 · 20 secA 360 rendering of Axiom Space’s sortie spacesuit for early Artemis missions. Credit: Axiom Space.
  • CSA Astronaut Discusses Life in Space with Canadian Media – Friday, October 30, 20262026 · 20 minAboard the International Space Station, Expedition 75 flight engineer Joshua Kutryk of CSA (Canadian Space Agency), discussed life and work aboard the orbital outpost during an in-flight interview Oct. 30 with reporters attending a Canadian media conference at CSA headquarters in St. Hubert, Canada. Kutryk is in the midst of a long-duration mission living and working aboard the microgravity…
  • Animation Explains U.S. Spacewalks 100 And 101 At the International Space Station – October 20, 20262026 · 8 minFlight controllers narrated animation describing the tasks for U.S. Spacewalks 100 and 101 at the International Space Station designed to install and deploy the final two sets of ISS Rollout Solar Arrays (IROSAs) that will complete the augmentation of power generation for the orbital complex. NASA astronaut Anil Menon and CSA (Canadian Space Agency) astronaut Joshua Kutryk will conduct the…
  • SLS Quick Disconnect Manufacturing2026 · 34 secBroll of manufacturing work of a redesigned SLS (Space Launch System) quick disconnect
  • CHAPEA Mission 2 Egress Event – Saturday, October 31, 20262026 · 26 minAfter more than a year spent isolated and confined on a simulated Mars mission, NASA's four-person volunteer crew will "return" to Earth on October 31, 2026. The crew of four stepped inside NASA’s CHAPEA (Crew Health and Performance Exploration Analog) habitat on Oct. 19, 2025. Ross Elder, Ellen Ellis, Matthew Montgomery, and James Spicer have been living and working for 378 days inside the…
  • Artemis III FR3 Ribbon Cutting Ceremony2026 · 4 minCharlie Blackwell-Thompson, Artemis launch director, Exploration Ground Systems, speaks during the Artemis II plaque ceremony of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida on Tuesday, Oct. 13, 2026. Following tradition, teams display a plaque with the mission’s insignia on the lobby wall to honor operations from the Launch Control Center. Also, a ribbon…
  • iss075m263131627_CSA_Astronaut_DisCSA Astronaut Discusses Life in Space with St. John’s University – Monday, November 9, 2026cusses_Life_in_2026 · 19 minAboard the International Space Station, Expedition 75 flight engineer Josh Kutryk of the Canadian Space Agency (CSA) discussed life and work aboard the orbital outpost during an in-flight interview Nov. 9 with St. John’s University and the Johnson Geo Center in St. John’s Newfoundland and Labrador. Kutryk is in the midst of a long-duration mission living and working aboard the microgravity…
  • From the International Space Station to Interstellar Space: A Message for Voyager 12026 · 1 minNASA astronaut Jessica Watkins, aboard the International Space Station, delivers a special message to Voyager 1 as the spacecraft reaches a historic milestone: one light-day from Earth. That means a signal traveling at the speed of light now takes 24 hours to reach humanity’s most distant spacecraft. Transmitted through NASA’s Deep Space Network, the message celebrates Voyager 1’s extraordinary…
  • 2026-11-18 - RS-25 Engine Test - Full Duration2026 · 3 minTeams at NASA’s Stennis Space Center near Bay St. Louis, Mississippi tested RS-25 engine No. 10001 on Nov. 18, 2026, on the Fred Haise Test Stand. The hot fire test lasted for the planned duration of three minutes and 20 seconds (200 seconds). While this developmental engine will not be used in flight, the hot fire test provides NASA and NASA’s prime engine contractor L3Harris Technologies with…
  • NASA Minute: Oct. 30, 20262026 · 1 minBig things are coming together at NASA, and some exciting journeys are just getting started. Here's what's new, in your NASA Minute.
  • Artemis III Terminal Count Simulation, LCC2026 · 3 minArtemis launch team members participate in a terminal countdown simulation for Artemis III on Thursday, Oct. 15, 2026, inside Firing Room 1 and 2 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida. The terminal countdown simulation conducted by the Artemis launch team runs through the final four hours of launch countdown, including terminal count – the…
  • 2026-10-21 - RS-25 Engine Test2026 · 8 minTeams at NASA’s Stennis Space Center near Bay St. Louis, Mississippi tested RS-25 engine No. 10001 on Oct. 21, 2026, on the Fred Haise Test Stand. The hot fire test lasted for almost eight-and-a-half minutes (500 seconds), the same amount of time RS-25 engines fire during launch of NASA’s SLS (Space Launch System) rocket, with a 111% power level. The main objectives of the test were to…

More from Artemis and the Moon

See all 2,971

Company

  • About NerdyTV
  • Contact

Support

  • Help Center
  • Supported Devices
  • Accessibility
  • Report a Copyright Issue
  • Sitemap

Legal

  • Privacy Policy
  • Terms of Use
  • Your Privacy Choices
  • Cookies

NerdyTV streams public domain and openly licensed video. The credit and licence are shown on every video page.