Skip to content
NerdyTV
Browse
On NowSpaceScienceMoviesClassic TVCollectionsMy Nerdy List

Artemis and the Moon

Progress 93 Cargo Ship Docking – Saturday, September 13, 2025

1 h 0 min · 2025

The uncrewed Roscosmos Progress 93 cargo spacecraft docked to the aft port of the Zvezda Service Module Sept. 13 after launching to the International Space Station from the Baikonur Cosmodrome in Kazakhstan Sept. 11 on a Soyuz booster rocket. Progress is filled with nearly three tons of supplies and cargo and will remain docked to the space station for approximately six months. Join NASA as we…

+ My Nerdy List
Credit
NASA/JSC
Licence
Public domain (NASA media usage guidelines)

Nerd Out On

  • 2026-11-18 - RS-25 Engine Test - Full Duration2026 · 3 minTeams at NASA’s Stennis Space Center near Bay St. Louis, Mississippi tested RS-25 engine No. 10001 on Nov. 18, 2026, on the Fred Haise Test Stand. The hot fire test lasted for the planned duration of three minutes and 20 seconds (200 seconds). While this developmental engine will not be used in flight, the hot fire test provides NASA and NASA’s prime engine contractor L3Harris Technologies with…
  • Axiom Space Sortie Spacesuit Turntable2026 · 20 secA 360 rendering of Axiom Space’s sortie spacesuit for early Artemis missions. Credit: Axiom Space.
  • Artemis III SLS Spacer Broll2026 · 37 secBroll of manufacturing work at NASA’s Marshall Space Flight Center in Huntsville, Alabama of the spacer that will fly in place of an upper stage on the rocket for Artemis III
  • Go Flight Rebecca Wingfield SOCIAL2026 · 4 minFrom a young age, NASA flight director Rebecca Wingfield knew space exploration was in her future. Her interest in math and science led her to pursue a degree in engineering at the University of Kentucky, where she participated in NASA’s cooperative education program. Wingfield began her career at NASA’s Johnson Space Center as a flight controller, witnessing firsthand the confluence of…
  • 2026-10-21 - RS-25 Engine Test2026 · 8 minTeams at NASA’s Stennis Space Center near Bay St. Louis, Mississippi tested RS-25 engine No. 10001 on Oct. 21, 2026, on the Fred Haise Test Stand. The hot fire test lasted for almost eight-and-a-half minutes (500 seconds), the same amount of time RS-25 engines fire during launch of NASA’s SLS (Space Launch System) rocket, with a 111% power level. The main objectives of the test were to…
  • iss075m263131627_CSA_Astronaut_DisCSA Astronaut Discusses Life in Space with St. John’s University – Monday, November 9, 2026cusses_Life_in_2026 · 19 minAboard the International Space Station, Expedition 75 flight engineer Josh Kutryk of the Canadian Space Agency (CSA) discussed life and work aboard the orbital outpost during an in-flight interview Nov. 9 with St. John’s University and the Johnson Geo Center in St. John’s Newfoundland and Labrador. Kutryk is in the midst of a long-duration mission living and working aboard the microgravity…
  • Go, Flight: Brandon Lloyd2026 · 5 minNASA flight director Brandon Lloyd describes the role of the flight director as a conductor of multi-disciplinary operations. From integrated simulations to executing NASA’s human spaceflight missions, he works with and harmonizes teams of flight controllers to ensure success. Lloyd is driven by a passion for exploring the unknown, and credits his background in music and sports with preparing…
  • NASA Astronauts Discuss Life in Space with Florida Students – Friday, October 16, 20262026 · 21 minAboard the International Space Station, Expedition 75 flight engineers Jessica Watkins and Luke Delaney discussed life and work aboard the orbital outpost during an in-flight interview Oct. 16 with students at the Sally Ride Elementary School in Orlando, Florida. Watkins and Delaney are in the midst of a long-duration mission living and working aboard the microgravity laboratory to advance…
  • Artemis III Short Stack Compilation Timelapse2026 · 7 minThe SLS (Space Launch System) rocket core stage is integrated with the solid rocket boosters for Artemis III in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on Monday, Oct. 26, 2026, to complete its short stack configuration. The 212-foot rocket stage was lifted from the transfer aisle using a one-of-a-kind lifting beam designed to lift the stage. The…
  • SLS Quick Disconnect Manufacturing2026 · 34 secBroll of manufacturing work of a redesigned SLS (Space Launch System) quick disconnect
  • Blue Origin Video from NASA Artemis Acceleration Update2026 · 2 minVideo provided by Blue Origin for NASA’s Oct. 23, 2026 Artemis acceleration update
  • Artemis Acceleration News Conference2026 · 2 h 4 minNASA leadership updates the agency's Artemis III mission plans and beyond at a news conference on Friday, Oct. 23, 2026, at the agency’s Kennedy Space Center in Florida. NASA Administrator Jared Isaacman; NASA Associate Administrator Amit Kshatriya; Jeremy Parsons, NASA’s Artemis program manager discuss the mission that will send four astronauts to low Earth orbit in 2027 to test critical…

More from Artemis and the Moon

See all 2,971

Company

  • About NerdyTV
  • Contact

Support

  • Help Center
  • Supported Devices
  • Accessibility
  • Report a Copyright Issue
  • Sitemap

Legal

  • Privacy Policy
  • Terms of Use
  • Your Privacy Choices
  • Cookies

NerdyTV streams public domain and openly licensed video. The credit and licence are shown on every video page.