Skip to content
NerdyTV
Browse
On NowSpaceScienceMoviesClassic TVCollectionsMy Nerdy List

Artemis and the Moon

Kennedy Countdown for Oct. 22, 2021

1 min · 2021

The rocket that will send the uncrewed Orion spacecraft on a journey around the Moon is now fully assembled at NASA's Kennedy Space Center in Florida. Teams with Exploration Ground Systems and contractor Jacobs lowered Orion onto the Space Launch System stack inside the Vehicle Assembly Building in preparation for the Artemis I launch. Also, NASA and SpaceX now are targeting Sunday, Oct. 31, for…

+ My Nerdy List
Credit
NASA/KSC
Licence
Public domain (NASA media usage guidelines)

Nerd Out On

  • SLS Quick Disconnect Manufacturing2026 · 34 secBroll of manufacturing work of a redesigned SLS (Space Launch System) quick disconnect
  • Artemis III Short Stack Compilation Timelapse2026 · 7 minThe SLS (Space Launch System) rocket core stage is integrated with the solid rocket boosters for Artemis III in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on Monday, Oct. 26, 2026, to complete its short stack configuration. The 212-foot rocket stage was lifted from the transfer aisle using a one-of-a-kind lifting beam designed to lift the stage. The…
  • Artemis II Solar Eclipse: 54 Minutes of Totality2026 · 3 minHear from a heliophysicist, a lunar scientist, and the Artemis II crew about the remarkable 54 minutes of totality the crew experienced while flying around the Moon.
  • NASA Expands Lunar Delivery Network to Support Moon Base Development2026 · 1 minNASA's lunar delivery network is growing. Establishing a sustained human presence on the Moon will require a steady flow of scientific instruments, new technologies, equipment, and infrastructure to the lunar surface. NASA has selected eight American companies for the next phase of its CLPS (Commercial Lunar Payload Services) initiative, expanding the network of commercial providers eligible for…
  • NASA Moon Base: November 2026 Update2026 · 1 h 35 minNASA announces several new missions and technology demonstrations that will help mankind explore the Moon. NASA Administrator Jared Isaacman; Carlos García-Galán, manager, Moon Base Program; Nicky Fox, associate administrator for NASA’s Science Mission Directorate; Dayna Ise, director, Utility and Infrastructure, Moon Base Program present an update on NASA’s Moon Base on Saturday, Nov. 7, 2026,…
  • Animation Explains U.S. Spacewalks 100 And 101 At the International Space Station – October 20, 20262026 · 8 minFlight controllers narrated animation describing the tasks for U.S. Spacewalks 100 and 101 at the International Space Station designed to install and deploy the final two sets of ISS Rollout Solar Arrays (IROSAs) that will complete the augmentation of power generation for the orbital complex. NASA astronaut Anil Menon and CSA (Canadian Space Agency) astronaut Joshua Kutryk will conduct the…
  • Blue Origin Video from NASA Artemis Acceleration Update2026 · 2 minVideo provided by Blue Origin for NASA’s Oct. 23, 2026 Artemis acceleration update
  • CSA Astronaut Discusses Life in Space With “Spacebound” Canadian Space Industry Event - Wednesday, October 21, 20262026 · 22 minAboard the International Space Station, Expedition 75 flight engineer Joshua Kutryk of CSA (Canadian Space Agency), discussed life and work aboard the orbital outpost during an in-flight interview Oct. 21 with attendees at the “Spacebound” space industry event at the Canadian Museum of History in Ottawa. Kutryk is in the midst of a long-duration mission living and working aboard the microgravity…
  • Astronaut Anil Menon Speaks with Mark Rober from the International Space Station – Wednesday, November 4, 20262026 · 33 minNASA astronaut Anil Menon, currently aboard the International Space Station, speaks with Mark Rober of the ClassCrunchLabs Foundation in advance of National STEM Day. During this live event, Rober and Menon will discuss questions submitted by students about the station and life in space. Menon will also demonstrate how everyday activities, from eating to experimenting, change in microgravity.…
  • 2026-11-18 - RS-25 Engine Test - Full Duration2026 · 3 minTeams at NASA’s Stennis Space Center near Bay St. Louis, Mississippi tested RS-25 engine No. 10001 on Nov. 18, 2026, on the Fred Haise Test Stand. The hot fire test lasted for the planned duration of three minutes and 20 seconds (200 seconds). While this developmental engine will not be used in flight, the hot fire test provides NASA and NASA’s prime engine contractor L3Harris Technologies with…
  • CSA Astronaut Discusses Life in Space – Wednesday, November 18, 20262026 · 20 minAboard the International Space Station, Expedition 75 flight engineer Josh Kutryk of CSA (Canadian Space Agency), discussed life and work aboard the orbital outpost during an in-flight interview on Nov. 18. Kutryk is in the midst of a long-duration mission living and working aboard the microgravity laboratory to advance scientific knowledge and demonstrate new technologies for future human and…
  • NASA Astronauts Discuss Life in Space with Florida Students – Tuesday, November 10, 20262026 · 22 minAboard the International Space Station, Expedition 75 flight engineers Jessica Watkins and Luke Delaney of NASA discussed life and work aboard the orbital outpost during an in-flight interview Nov. 10 with students attending the Freedom Crossing Academy in St. John, Florida. Watkins and Delaney are in the midst of a long-duration mission living and working aboard the microgravity laboratory to…

More from Artemis and the Moon

See all 2,971

Company

  • About NerdyTV
  • Contact

Support

  • Help Center
  • Supported Devices
  • Accessibility
  • Report a Copyright Issue
  • Sitemap

Legal

  • Privacy Policy
  • Terms of Use
  • Your Privacy Choices
  • Cookies

NerdyTV streams public domain and openly licensed video. The credit and licence are shown on every video page.