Artemis and the Moon
NASA Conducts Long Duration Hot Fire of RS-25 Certification Test
10 min · 2023
NASA conducted a long duration hot fire of an RS-25 certification engine March 21, continuing a key series of testing to support future Space Launch System (SLS) missions to deep space. Operators fired the certification engine for 10 minutes (600 seconds), longer than the 500 seconds engines must fire during an actual mission, on the Fred Haise Test Stand at NASA’s Stennis Space Center. Hot…
- Credit
- NASA/SSC
- Licence
- Public domain (NASA media usage guidelines)