Artemis and the Moon
Crane Replacement in the Operations and Checkout Building High Bay
58 sec · 2021
Teams from American Crane and Equipment Corporation recently replaced the facility’s existing crane with a new crane that features greater lift capability and enhanced controls. Situated on the upper railings of the high bay, the O&C’s newest crane joins the family of two other cranes on the high bay’s lower railings. Its initial use will be in support of Artemis II, the program’s first crewed…
- Credit
- NASA/KSC
- Licence
- Public domain (NASA media usage guidelines)