Skip to content
NerdyTV
Browse
On NowSpaceScienceMoviesClassic TVCollectionsMy Nerdy List

Artemis and the Moon

LH2 Tank Construction at Pad 39B

1 min · 2019

LH2 Tank Construction at Launch Complex 39B.

+ My Nerdy List
Credit
NASA/KSC
Licence
Public domain (NASA media usage guidelines)

Nerd Out On

  • MAX POWER: Highlights from NASA’s First-Ever Tech Expo and Air Show2026 · 1 minRelive the best moments from MAX POWER, NASA's first-ever tech expo and air show at and around Kennedy Space Center in Florida. Thousands gathered over several days in early November for NASA's first exhibition of America's superiority in space, aeronautics, and technology. The family-friendly event honored the nation's 250th anniversary and capped off the agency's Inspiration Tour. Highlights…
  • NASA’s SpaceX Crew-12 Post-Flight News Conference – Thursday, October 15, 20262026 · 38 minNASA’s SpaceX Crew-12 Post-Flight News Conference After completing a more than seven month long mission to the International Space Station, three members of NASA’s SpaceX Crew-12 discussed their science mission during a news conference Oct. 15 at the agency’s Johnson Space Center in Houston. NASA astronauts Jessica Meir and Jack Hathaway as well as Roscosmos cosmonaut Andrey Fedyaev answered…
  • 2026-10-21 - RS-25 Engine Test2026 · 8 minTeams at NASA’s Stennis Space Center near Bay St. Louis, Mississippi tested RS-25 engine No. 10001 on Oct. 21, 2026, on the Fred Haise Test Stand. The hot fire test lasted for almost eight-and-a-half minutes (500 seconds), the same amount of time RS-25 engines fire during launch of NASA’s SLS (Space Launch System) rocket, with a 111% power level. The main objectives of the test were to…
  • Artemis III Launch Simulation - Cryo Sim2026 · 4 minArtemis III launch team members participate in a cryogenic propellant loading simulation on Wednesday, Oct. 14, 2026, inside Firing Rooms 1 and 2 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida. Members of NASA’s Exploration Ground Systems team rehearse the steps to load the super-cooled liquid hydrogen and liquid oxygen into the SLS (Space Launch System)…
  • NASA Moon Base: November 2026 Update2026 · 1 h 34 minASA announces several new missions and technology demonstrations that will help mankind explore the Moon. NASA Administrator Jared Isaacman; Carlos García-Galán, manager, Moon Base Program; Nicky Fox, associate administrator for NASA’s Science Mission Directorate; Dayna Ise, director, Utility and Infrastructure, Moon Base Program present an update on NASA’s Moon Base on Saturday, Nov. 7, 2026,…
  • SLS Quick Disconnect Manufacturing2026 · 34 secBroll of manufacturing work of a redesigned SLS (Space Launch System) quick disconnect
  • Artemis Acceleration News Conference2026 · 2 h 4 minNASA leadership updates the agency's Artemis III mission plans and beyond at a news conference on Friday, Oct. 23, 2026, at the agency’s Kennedy Space Center in Florida. NASA Administrator Jared Isaacman; NASA Associate Administrator Amit Kshatriya; Jeremy Parsons, NASA’s Artemis program manager discuss the mission that will send four astronauts to low Earth orbit in 2027 to test critical…
  • Artemis II Solar Eclipse: 54 Minutes of Totality2026 · 3 minHear from a heliophysicist, a lunar scientist, and the Artemis II crew about the remarkable 54 minutes of totality the crew experienced while flying around the Moon.
  • Artemis III Terminal Count Simulation, LCC2026 · 3 minArtemis launch team members participate in a terminal countdown simulation for Artemis III on Thursday, Oct. 15, 2026, inside Firing Room 1 and 2 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida. The terminal countdown simulation conducted by the Artemis launch team runs through the final four hours of launch countdown, including terminal count – the…
  • Blue Origin Video from NASA Artemis Acceleration Update2026 · 2 minVideo provided by Blue Origin for NASA’s Oct. 23, 2026 Artemis acceleration update
  • 2026-11-18 - RS-25 Engine Test - Full Duration2026 · 3 minTeams at NASA’s Stennis Space Center near Bay St. Louis, Mississippi tested RS-25 engine No. 10001 on Nov. 18, 2026, on the Fred Haise Test Stand. The hot fire test lasted for the planned duration of three minutes and 20 seconds (200 seconds). While this developmental engine will not be used in flight, the hot fire test provides NASA and NASA’s prime engine contractor L3Harris Technologies with…
  • NASA Astronauts Discuss Life in Space With WESH-TV and KUSA-TV – Friday, November 6, 20262026 · 19 minAboard the International Space Station, Expedition 75 flight engineers Jessica Watkins and Luke Delaney discussed life and work aboard the orbital outpost during an in-flight interview Nov. 6 with WESH-TV, Orlando and KUSA-TV, Denver. Watkins and Delaney are in the midst of a long-duration mission living and working aboard the microgravity laboratory to advance scientific knowledge and…

More from Artemis and the Moon

See all 2,971

Company

  • About NerdyTV
  • Contact

Support

  • Help Center
  • Supported Devices
  • Accessibility
  • Report a Copyright Issue
  • Sitemap

Legal

  • Privacy Policy
  • Terms of Use
  • Your Privacy Choices
  • Cookies

NerdyTV streams public domain and openly licensed video. The credit and licence are shown on every video page.