Skip to content
NerdyTV
Browse
On NowSpaceScienceMoviesClassic TVCollectionsMy Nerdy List

Artemis and the Moon

SLS Exploration Upper Stage Test Article Offloaded in Area 94

3 min · 2023

These images show technicians at NASA’s Michoud Assembly Facility in New Orleans removing a weld-confidence article from a robotic welding tool in December 2023. This article features pieces of a liquid hydrogen tank dome that were welded as a test to make sure the dome used for flight will be welded correctly. The dome will be part of the new, four-engine EUS (exploration upper stage) for…

+ My Nerdy List
Credit
NASA/MAF
Licence
Public domain (NASA media usage guidelines)

Nerd Out On

  • NASA Jets in the Pacific Airshow2026 · 9 minNASA’s F/A‑18 and F‑15 aircraft, along with Administrator Jared Isaacman’s F‑5s, flew in the 2026 Pacific Airshow in Huntington Beach, California, from Friday through Sunday, Oct. 2-4. The flights showcased NASA’s aeronautics research capabilities during one of the nation’s largest aviation events. NASA also hosted an exhibit featuring elements of its Quesst mission, Artemis plans, and a model…
  • NASA Astronauts Discuss Life in Space With WESH-TV and KUSA-TV – Friday, November 6, 20262026 · 19 minAboard the International Space Station, Expedition 75 flight engineers Jessica Watkins and Luke Delaney discussed life and work aboard the orbital outpost during an in-flight interview Nov. 6 with WESH-TV, Orlando and KUSA-TV, Denver. Watkins and Delaney are in the midst of a long-duration mission living and working aboard the microgravity laboratory to advance scientific knowledge and…
  • SpaceX Video from NASA Artemis Acceleration Update2026 · 2 minVideo provided by SpaceX for NASA’s Oct. 23, 2026 Artemis acceleration update
  • CSA Astronaut Discusses Life in Space – Wednesday, November 18, 20262026 · 20 minAboard the International Space Station, Expedition 75 flight engineer Josh Kutryk of CSA (Canadian Space Agency), discussed life and work aboard the orbital outpost during an in-flight interview on Nov. 18. Kutryk is in the midst of a long-duration mission living and working aboard the microgravity laboratory to advance scientific knowledge and demonstrate new technologies for future human and…
  • 2026-10-21 - RS-25 Engine Test2026 · 8 minTeams at NASA’s Stennis Space Center near Bay St. Louis, Mississippi tested RS-25 engine No. 10001 on Oct. 21, 2026, on the Fred Haise Test Stand. The hot fire test lasted for almost eight-and-a-half minutes (500 seconds), the same amount of time RS-25 engines fire during launch of NASA’s SLS (Space Launch System) rocket, with a 111% power level. The main objectives of the test were to…
  • Artemis III November Launch Sim2026 · 2 minArtemis launch team members participate in a launch countdown simulation for Artemis III on Tuesday, Nov. 10, 2026, inside Firing Room 1 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida. This marked the first long day simulation for the Artemis III mission where teams combined the cryogenic propellant loading and terminal count portions of the countdown.…
  • NASA Astronaut Discusses Life in Space with New Hampshire Students – Thursday, September 24, 20262026 · 21 minAboard the International Space Station, NASA astronaut Anil Menon discussed life and work aboard the orbital outpost during an in-flight interview Sept. 24 with students at the McAuliffe-Shepard Discovery Center in Concord, New Hampshire. Menon is in the midst of a long-duration mission aboard the microgravity laboratory to advance scientific knowledge and demonstrate new technologies for future…
  • Artemis III Launch Simulation - Cryo Sim2026 · 4 minArtemis III launch team members participate in a cryogenic propellant loading simulation on Wednesday, Oct. 14, 2026, inside Firing Rooms 1 and 2 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida. Members of NASA’s Exploration Ground Systems team rehearse the steps to load the super-cooled liquid hydrogen and liquid oxygen into the SLS (Space Launch System)…
  • 2026-11-18 - RS-25 Engine Test - Full Duration2026 · 3 minTeams at NASA’s Stennis Space Center near Bay St. Louis, Mississippi tested RS-25 engine No. 10001 on Nov. 18, 2026, on the Fred Haise Test Stand. The hot fire test lasted for the planned duration of three minutes and 20 seconds (200 seconds). While this developmental engine will not be used in flight, the hot fire test provides NASA and NASA’s prime engine contractor L3Harris Technologies with…
  • Go, Flight: Brandon Lloyd2026 · 5 minNASA flight director Brandon Lloyd describes the role of the flight director as a conductor of multi-disciplinary operations. From integrated simulations to executing NASA’s human spaceflight missions, he works with and harmonizes teams of flight controllers to ensure success. Lloyd is driven by a passion for exploring the unknown, and credits his background in music and sports with preparing…
  • NASA Moon Base: Rovers and Lunar Terrain Vehicles (October 2026 Update)2026 · 9 minThere's a lot of ground to cover when you're building a Moon Base. From robotic rovers exploring the rugged lunar landscape to lunar terrain vehicles carrying Artemis astronauts across the surface, mobility will play a crucial role in establishing an enduring human presence on the Moon. During the early phases of Moon Base development, these vehicles will help NASA investigate the lunar South…
  • Artemis II Solar Eclipse: 54 Minutes of Totality2026 · 3 minHear from a heliophysicist, a lunar scientist, and the Artemis II crew about the remarkable 54 minutes of totality the crew experienced while flying around the Moon.

More from Artemis and the Moon

See all 2,971

Company

  • About NerdyTV
  • Contact

Support

  • Help Center
  • Supported Devices
  • Accessibility
  • Report a Copyright Issue
  • Sitemap

Legal

  • Privacy Policy
  • Terms of Use
  • Your Privacy Choices
  • Cookies

NerdyTV streams public domain and openly licensed video. The credit and licence are shown on every video page.