Skip to content
NerdyTV
Browse
On NowSpaceScienceMoviesClassic TVCollectionsMy Nerdy List

Artemis and the Moon

NASA Administrator Bridenstine Speaks at 35th Space Symposium

3 min · 2019

NASA Administrator Jim Bridenstine delivered a keynote address April 9 during the 35th Space Symposium in Colorado Springs, Colorado. During his speech, Bridenstine outlined NASA’s accelerated plans to send American astronauts to the Moon’s South Pole by 2024. The president’s direction from Space Policy Directive-1 galvanizes NASA’s return to the Moon and builds on progress on the Space Launch…

+ My Nerdy List
Credit
NASA/HQ
Licence
Public domain (NASA media usage guidelines)

Nerd Out On

  • Artemis III Terminal Count Simulation, LCC2026 · 3 minArtemis launch team members participate in a terminal countdown simulation for Artemis III on Thursday, Oct. 15, 2026, inside Firing Room 1 and 2 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida. The terminal countdown simulation conducted by the Artemis launch team runs through the final four hours of launch countdown, including terminal count – the…
  • SLS Quick Disconnect Manufacturing2026 · 34 secBroll of manufacturing work of a redesigned SLS (Space Launch System) quick disconnect
  • NASA Minute: Oct. 10, 20262026 · 2 minThis week, NASA’s mission stretched from the edge of the Arctic to the shores of the Mediterranean, and from low Earth orbit to the far side of the Moon. Here’s what’s new, in your NASA Minute.
  • U.S. Spacewalks 100 and 101 Preview News Conference – Tuesday, October 20, 20262026 · 27 minNASA hosted a news conference at NASA’s Johnson Space Center in Houston on Oct. 20 to discuss two upcoming spacewalks outside the International Space Station targeted for Oct. 29 and Nov. 5 to install International Space Station Solar Arrays on the 2A and 3B power channels of the station. NASA astronaut Anil Menon and Canadian Space Agency (CSA) astronaut Josh Kutryk will venture outside station…
  • Artemis III November Launch Sim2026 · 2 minArtemis launch team members participate in a launch countdown simulation for Artemis III on Tuesday, Nov. 10, 2026, inside Firing Room 1 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida. This marked the first long day simulation for the Artemis III mission where teams combined the cryogenic propellant loading and terminal count portions of the countdown.…
  • Animation Explains U.S. Spacewalks 100 And 101 At the International Space Station – October 20, 20262026 · 8 minFlight controllers narrated animation describing the tasks for U.S. Spacewalks 100 and 101 at the International Space Station designed to install and deploy the final two sets of ISS Rollout Solar Arrays (IROSAs) that will complete the augmentation of power generation for the orbital complex. NASA astronaut Anil Menon and CSA (Canadian Space Agency) astronaut Joshua Kutryk will conduct the…
  • NASA Moon Base: November 2026 Update2026 · 1 h 34 minASA announces several new missions and technology demonstrations that will help mankind explore the Moon. NASA Administrator Jared Isaacman; Carlos García-Galán, manager, Moon Base Program; Nicky Fox, associate administrator for NASA’s Science Mission Directorate; Dayna Ise, director, Utility and Infrastructure, Moon Base Program present an update on NASA’s Moon Base on Saturday, Nov. 7, 2026,…
  • Artemis Acceleration Hype Video2026 · 49 secArtemis Acceleration Hype Video
  • Artemis III FR3 Ribbon Cutting Ceremony2026 · 4 minCharlie Blackwell-Thompson, Artemis launch director, Exploration Ground Systems, speaks during the Artemis II plaque ceremony of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida on Tuesday, Oct. 13, 2026. Following tradition, teams display a plaque with the mission’s insignia on the lobby wall to honor operations from the Launch Control Center. Also, a ribbon…
  • 2026-11-18 - RS-25 Engine Test - Full Duration2026 · 3 minTeams at NASA’s Stennis Space Center near Bay St. Louis, Mississippi tested RS-25 engine No. 10001 on Nov. 18, 2026, on the Fred Haise Test Stand. The hot fire test lasted for the planned duration of three minutes and 20 seconds (200 seconds). While this developmental engine will not be used in flight, the hot fire test provides NASA and NASA’s prime engine contractor L3Harris Technologies with…
  • NASA’s SpaceX Crew-12 Post-Flight News Conference – Thursday, October 15, 20262026 · 38 minNASA’s SpaceX Crew-12 Post-Flight News Conference After completing a more than seven month long mission to the International Space Station, three members of NASA’s SpaceX Crew-12 discussed their science mission during a news conference Oct. 15 at the agency’s Johnson Space Center in Houston. NASA astronauts Jessica Meir and Jack Hathaway as well as Roscosmos cosmonaut Andrey Fedyaev answered…
  • Go Flight Rebecca Wingfield SOCIAL2026 · 4 minFrom a young age, NASA flight director Rebecca Wingfield knew space exploration was in her future. Her interest in math and science led her to pursue a degree in engineering at the University of Kentucky, where she participated in NASA’s cooperative education program. Wingfield began her career at NASA’s Johnson Space Center as a flight controller, witnessing firsthand the confluence of…

More from Artemis and the Moon

See all 2,971

Company

  • About NerdyTV
  • Contact

Support

  • Help Center
  • Supported Devices
  • Accessibility
  • Report a Copyright Issue
  • Sitemap

Legal

  • Privacy Policy
  • Terms of Use
  • Your Privacy Choices
  • Cookies

NerdyTV streams public domain and openly licensed video. The credit and licence are shown on every video page.