Skip to content
NerdyTV
Browse
On NowSpaceScienceMoviesClassic TVCollectionsMy Nerdy List

Artemis and the Moon

Artemis I Stacking Timelapse Compiled

56 sec · 2021

Timelapse edit of Artemis I hardware stacking at the Vertical Assembly Building (VAB), Kennedy Space Center.

+ My Nerdy List
Credit
NASA/MSFC
Licence
Public domain (NASA media usage guidelines)

Nerd Out On

  • Artemis III November Launch Sim2026 · 2 minArtemis launch team members participate in a launch countdown simulation for Artemis III on Tuesday, Nov. 10, 2026, inside Firing Room 1 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida. This marked the first long day simulation for the Artemis III mission where teams combined the cryogenic propellant loading and terminal count portions of the countdown.…
  • NASA Astronauts Discuss Life in Space with Florida Students – Friday, October 16, 20262026 · 21 minAboard the International Space Station, Expedition 75 flight engineers Jessica Watkins and Luke Delaney discussed life and work aboard the orbital outpost during an in-flight interview Oct. 16 with students at the Sally Ride Elementary School in Orlando, Florida. Watkins and Delaney are in the midst of a long-duration mission living and working aboard the microgravity laboratory to advance…
  • NASA’s SpaceX 35th Commercial Resupply Services Rendezvous and Docking – Thursday, October 15, 20262026 · 1 h 41 minNASA'S SPACEX 35th COMMERCIAL RESUPPLY SERVICES RENDEZVOUS AND DOCKING Loaded with scientific experiments and supplies, an unpiloted SpaceX Dragon spacecraft automatically docked to the International Space Station’s zenith-facing port of the Harmony module Oct. 15. The SpaceX resupply spacecraft launched from Space Launch Complex 40 at Cape Canaveral Space Force Station in Florida Oct. 13 as…
  • NASA Minute: Oct. 10, 20262026 · 2 minThis week, NASA’s mission stretched from the edge of the Arctic to the shores of the Mediterranean, and from low Earth orbit to the far side of the Moon. Here’s what’s new, in your NASA Minute.
  • NASA Minute: Oct. 23, 20262026 · 2 minNASA is accelerating Artemis, and this week, we shared some major updates on our path back to the Moon! From rocket hardware to updated mission plans, here's what you need to know, in this special edition of the NASA Minute.
  • MAX POWER: Highlights from NASA’s First-Ever Tech Expo and Air Show2026 · 1 minRelive the best moments from MAX POWER, NASA's first-ever tech expo and air show at and around Kennedy Space Center in Florida. Thousands gathered over several days in early November for NASA's first exhibition of America's superiority in space, aeronautics, and technology. The family-friendly event honored the nation's 250th anniversary and capped off the agency's Inspiration Tour. Highlights…
  • Artemis Acceleration Hype Video2026 · 49 secArtemis Acceleration Hype Video
  • Artemis III Terminal Count Simulation, LCC2026 · 3 minArtemis launch team members participate in a terminal countdown simulation for Artemis III on Thursday, Oct. 15, 2026, inside Firing Room 1 and 2 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida. The terminal countdown simulation conducted by the Artemis launch team runs through the final four hours of launch countdown, including terminal count – the…
  • Artemis III Short Stack Compilation Timelapse2026 · 7 minThe SLS (Space Launch System) rocket core stage is integrated with the solid rocket boosters for Artemis III in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on Monday, Oct. 26, 2026, to complete its short stack configuration. The 212-foot rocket stage was lifted from the transfer aisle using a one-of-a-kind lifting beam designed to lift the stage. The…
  • 2026-11-18 - RS-25 Engine Test - Full Duration2026 · 3 minTeams at NASA’s Stennis Space Center near Bay St. Louis, Mississippi tested RS-25 engine No. 10001 on Nov. 18, 2026, on the Fred Haise Test Stand. The hot fire test lasted for the planned duration of three minutes and 20 seconds (200 seconds). While this developmental engine will not be used in flight, the hot fire test provides NASA and NASA’s prime engine contractor L3Harris Technologies with…
  • 2026-10-21 - RS-25 Engine Test2026 · 8 minTeams at NASA’s Stennis Space Center near Bay St. Louis, Mississippi tested RS-25 engine No. 10001 on Oct. 21, 2026, on the Fred Haise Test Stand. The hot fire test lasted for almost eight-and-a-half minutes (500 seconds), the same amount of time RS-25 engines fire during launch of NASA’s SLS (Space Launch System) rocket, with a 111% power level. The main objectives of the test were to…
  • PROMISE: Bringing Mars Rover Innovation to the Moon2026 · 47 secMeet PROMISE, NASA's nuclear-powered lunar rover. We're bringing decades of Mars rover innovation to the Moon with the Polar Rover for Observation, Mapping, and In-Situ Exploration (PROMISE), a new mission NASA is advancing to help lay the groundwork for a sustained human presence on the lunar surface. NASA has selected Blue Origin to deliver PROMISE to the lunar South Pole region. Built by…

More from Artemis and the Moon

See all 2,971

Company

  • About NerdyTV
  • Contact

Support

  • Help Center
  • Supported Devices
  • Accessibility
  • Report a Copyright Issue
  • Sitemap

Legal

  • Privacy Policy
  • Terms of Use
  • Your Privacy Choices
  • Cookies

NerdyTV streams public domain and openly licensed video. The credit and licence are shown on every video page.