Skip to content
NerdyTV
Browse
On NowSpaceScienceMoviesClassic TVCollectionsMy Nerdy List

Launches and Rockets

OFT-2 Starliner Rollout to Vertical Integration Facility

5 min · 2021

OFT-2 Starliner Rollout to Vertical Integration Facility

+ My Nerdy List
Credit
NASA/KSC
Licence
Public domain (NASA media usage guidelines)

Nerd Out On

  • NASA's Nancy Grace Roman Space Telescope Postlaunch News Conference - 4K2026 · 56 minNASA and industry leaders participate in a postlaunch news conference for NASA’s Nancy Grace Roman Space Telescope inside the NASA News Center’s John Holliman Auditorium at Kennedy Space Center in Florida, on Sunday, Aug. 30, 2026. Participants include NASA Administrator Jared Isaacman; Nicky Fox, associate administrator, Science Mission Directorate, NASA Headquarters in Washington; Jackie…
  • NASA's Nancy Grace Roman Space Telescope Science Briefing - 1080p2026 · 1 h 2 minNASA and industry leaders participate in a science briefing for NASA’s Nancy Grace Roman Space Telescope on inside the NASA News Center’s John Holliman Auditorium at Kennedy Space Center in Florida, on Saturday, Aug. 29, 2026. Participants include Shawn Domagal-Goldman, director, Astrophysics Division, NASA Headquarters in Washington; Julie McEnery, Roman telescope senior project scientist,…
  • Swearing In Cermony of Civil Servants at KSC2026 · 1 minNew NASA civil servants pose for a photograph following their swearing-in ceremony on Monday, June 15, 2026, at the agency’s Kennedy Space Center in Florida. The 138 employees from NASA Kennedy and Vandenberg Space Force Base in California are the latest onboarded as part of NASA Administrator Jared Isaacman’s workforce directive ongoing efforts to strengthen core capabilities, support mission…
  • NASA's Nancy Grace Roman Space Telescope Live Launch Coverage - 4K2026 · 1 h 49 minNASA's coverage of the agency's Nancy Grace Roman Space Telescope leading to launch atop a SpaceX Falcon Heavy rocket from Launch Complex 39A at the agency’s Kennedy Space Center in Florida on Sunday, Aug. 30, 2026. The milestone begins the observatory’s journey to explore the large‑scale structure of the universe. Roman will investigate dark energy and dark matter, conduct a statistical census…
  • Sentinel-6B Solar Array Cover Installation and Spacecraft Rotation at Astrotech, VSFB2025 · 5 minTechnicians install protective solar array covers for the Sentinel-6B spacecraft inside the Astrotech Space Operations payload processing facility at Vandenberg Space Force Base in California on Friday, Sept. 26, 2025. Sentinel-6B will undergo detailed inspections, tests, and fueling in a cleanroom as it prepares for a November launch on a SpaceX Falcon 9 rocket. A collaboration between NASA,…
  • Production Begins on Sixth Core Stage Hardware2026 · 21 secTeams at NASA’s Michoud Assembly Facility in New Orleans continue to make progress manufacturing core stages for the SLS (Space Launch System) rocket. In August, teams with NASA and Boeing, SLS core stage prime contractor, completed the first ring for the sixth SLS core stage. The core stage rings are welded together through a friction-stir welding process. A completed ring is 27.6 feet in…
  • Roman Space Telescope Processing at PHSF2026 · 1 minNASA's Nancy Grace Roman Space Telescope after engineers and technicians working inside the Payload Hazardous Servicing Facility at NASA’s Kennedy Space Center in Florida had carefully mated the observatory to its payload adapter and a strut payload attach fitting, a specialized piece of hardware designed for large, heavy loads. This allows the team to secure the payload to the second stage on…
  • NASA's Nancy Grace Roman Space Telescope Science Briefing - 4K2026 · 1 h 2 minNASA and industry leaders participate in a science briefing for NASA’s Nancy Grace Roman Space Telescope on inside the NASA News Center’s John Holliman Auditorium at Kennedy Space Center in Florida, on Saturday, Aug. 29, 2026. Participants include Shawn Domagal-Goldman, director, Astrophysics Division, NASA Headquarters in Washington; Julie McEnery, Roman telescope senior project scientist,…
  • Sentinel-6B Spacecraft Mated to Work Stand at Astrotech, VSFB2025 · 5 minTechnicians use a crane to lift the Sentinel-6B spacecraft and attach it to a work stand to conduct prelaunch operations inside a cleanroom of the Astrotech Space Operations payload processing facility at Vandenberg Space Force Base in California on Thursday, Sept. 25, 2025. Sentinel-6B will undergo detailed inspections, tests, and fueling in a cleanroom as it prepares for a November launch on a…
  • Roman Space Telescope Transport from PHSF to LC 39A2026 · 3 minNASA’s Nancy Grace Roman Space Telescope, encapsulated in its payload fairing, travels from the Payload Hazardous Servicing Facility to the SpaceX hangar at Launch Complex 39A at NASA’s Kennedy Space Center on Tuesday, Aug. 25, 2026, ahead of mating to a SpaceX Falcon Heavy rocket. Roman’s science instruments are designed to help researchers understand dark energy, the mysterious force…
  • Sentinel-6B Spacecraft Mate to PLA2025 · 2 minSentinel-6B Spacecraft Mate to PLA at Astrotech Space Operations, Vandenberg Space Force Base in California.
  • Dr. Julie McEnry addressing KSC Workforce2026 · 5 minUnveiling the Hidden Universe: The Roman Space Telescope Mission with Dr. Julie McEnery

More from Launches and Rockets

See all 1,003

Company

  • About NerdyTV
  • Contact

Support

  • Help Center
  • Supported Devices
  • Accessibility
  • Report a Copyright Issue
  • Sitemap

Legal

  • Privacy Policy
  • Terms of Use
  • Your Privacy Choices
  • Cookies

NerdyTV streams public domain and openly licensed video. The credit and licence are shown on every video page.