Artemis and the Moon
Nominal Wet Flow Test at Pad 39B
1 min · 2019
A wet flow test at Pad 39B September 13, 2019, tests the sound suppression system that will be used for launch of NASA's Space Launch System for the Artemis I mission. During the test, about 450,000 gallons of water poured onto the Pad B flame deflector, the mobile launcher flame hole and onto the launcher's blast deck. This was the first time the ground launch sequencer that will be used on the…
- Credit
- NASA/KSC
- Licence
- Public domain (NASA media usage guidelines)