Skip to content
NerdyTV
Browse
On NowSpaceScienceMoviesClassic TVCollectionsMy Nerdy List

Artemis and the Moon

Artemis II SRB #9 Rollover and Lift - Left Forward Assembly (LFA)

4 min · 2025

Stacking SRB #9 in VAB Timelapse

+ My Nerdy List
Credit
NASA/KSC
Licence
Public domain (NASA media usage guidelines)

Nerd Out On

  • Artemis III Launch Simulation - Cryo Sim2026 · 4 minArtemis III launch team members participate in a cryogenic propellant loading simulation on Wednesday, Oct. 14, 2026, inside Firing Rooms 1 and 2 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida. Members of NASA’s Exploration Ground Systems team rehearse the steps to load the super-cooled liquid hydrogen and liquid oxygen into the SLS (Space Launch System)…
  • 2026-11-18 - RS-25 Engine Test - Full Duration2026 · 3 minTeams at NASA’s Stennis Space Center near Bay St. Louis, Mississippi tested RS-25 engine No. 10001 on Nov. 18, 2026, on the Fred Haise Test Stand. The hot fire test lasted for the planned duration of three minutes and 20 seconds (200 seconds). While this developmental engine will not be used in flight, the hot fire test provides NASA and NASA’s prime engine contractor L3Harris Technologies with…
  • NASA’s SpaceX 35th Commercial Resupply Services Rendezvous and Docking – Thursday, October 15, 20262026 · 1 h 41 minNASA'S SPACEX 35th COMMERCIAL RESUPPLY SERVICES RENDEZVOUS AND DOCKING Loaded with scientific experiments and supplies, an unpiloted SpaceX Dragon spacecraft automatically docked to the International Space Station’s zenith-facing port of the Harmony module Oct. 15. The SpaceX resupply spacecraft launched from Space Launch Complex 40 at Cape Canaveral Space Force Station in Florida Oct. 13 as…
  • NASA Moon Base: November 2026 Update2026 · 1 h 34 minASA announces several new missions and technology demonstrations that will help mankind explore the Moon. NASA Administrator Jared Isaacman; Carlos García-Galán, manager, Moon Base Program; Nicky Fox, associate administrator for NASA’s Science Mission Directorate; Dayna Ise, director, Utility and Infrastructure, Moon Base Program present an update on NASA’s Moon Base on Saturday, Nov. 7, 2026,…
  • NASA Moon Base: Rovers and Lunar Terrain Vehicles (October 2026 Update)2026 · 9 minThere's a lot of ground to cover when you're building a Moon Base. From robotic rovers exploring the rugged lunar landscape to lunar terrain vehicles carrying Artemis astronauts across the surface, mobility will play a crucial role in establishing an enduring human presence on the Moon. During the early phases of Moon Base development, these vehicles will help NASA investigate the lunar South…
  • Animation Explains U.S. Spacewalks 100 And 101 At the International Space Station – October 20, 20262026 · 8 minFlight controllers narrated animation describing the tasks for U.S. Spacewalks 100 and 101 at the International Space Station designed to install and deploy the final two sets of ISS Rollout Solar Arrays (IROSAs) that will complete the augmentation of power generation for the orbital complex. NASA astronaut Anil Menon and CSA (Canadian Space Agency) astronaut Joshua Kutryk will conduct the…
  • NASA Astronauts Discuss Life in Space With WESH-TV and KUSA-TV – Friday, November 6, 20262026 · 19 minAboard the International Space Station, Expedition 75 flight engineers Jessica Watkins and Luke Delaney discussed life and work aboard the orbital outpost during an in-flight interview Nov. 6 with WESH-TV, Orlando and KUSA-TV, Denver. Watkins and Delaney are in the midst of a long-duration mission living and working aboard the microgravity laboratory to advance scientific knowledge and…
  • NASA Minute: Oct. 10, 20262026 · 2 minThis week, NASA’s mission stretched from the edge of the Arctic to the shores of the Mediterranean, and from low Earth orbit to the far side of the Moon. Here’s what’s new, in your NASA Minute.
  • Artemis III November Launch Sim2026 · 2 minArtemis launch team members participate in a launch countdown simulation for Artemis III on Tuesday, Nov. 10, 2026, inside Firing Room 1 of the Rocco A. Petrone Launch Control Center at NASA’s Kennedy Space Center in Florida. This marked the first long day simulation for the Artemis III mission where teams combined the cryogenic propellant loading and terminal count portions of the countdown.…
  • SLS Quick Disconnect Manufacturing2026 · 34 secBroll of manufacturing work of a redesigned SLS (Space Launch System) quick disconnect
  • 2026-10-21 - RS-25 Engine Test2026 · 8 minTeams at NASA’s Stennis Space Center near Bay St. Louis, Mississippi tested RS-25 engine No. 10001 on Oct. 21, 2026, on the Fred Haise Test Stand. The hot fire test lasted for almost eight-and-a-half minutes (500 seconds), the same amount of time RS-25 engines fire during launch of NASA’s SLS (Space Launch System) rocket, with a 111% power level. The main objectives of the test were to…
  • NASA Moon Base: November 2026 Update2026 · 1 h 35 minNASA announces several new missions and technology demonstrations that will help mankind explore the Moon. NASA Administrator Jared Isaacman; Carlos García-Galán, manager, Moon Base Program; Nicky Fox, associate administrator for NASA’s Science Mission Directorate; Dayna Ise, director, Utility and Infrastructure, Moon Base Program present an update on NASA’s Moon Base on Saturday, Nov. 7, 2026,…

More from Artemis and the Moon

See all 2,971

Company

  • About NerdyTV
  • Contact

Support

  • Help Center
  • Supported Devices
  • Accessibility
  • Report a Copyright Issue
  • Sitemap

Legal

  • Privacy Policy
  • Terms of Use
  • Your Privacy Choices
  • Cookies

NerdyTV streams public domain and openly licensed video. The credit and licence are shown on every video page.